Construction of an outbound baggage facility to serve six aircraft gates
for the Terminal A “Banjo”. The facility consisted of a pre-engineered
baggage building, baggage handling conveyance system from the Terminal
A TSA screening area to the pre-engineered baggage building, and necessary appurtenances.